QUALITY CONTROL AND ON-SITE TESTING
Features:
- Dielectric test on Sheykh Bahayi substation GIS 400 kV in Tehran
- Dielectric test on Mobarakeh Steel substation GIS 400 kV in Isfahan
- Dielectric test on 400 kV GIS substation Besat Power Plant in South Pars
- Dielectric test on 63 kV gas turbines of Mobarakeh Steel Co., Isfahan
- Dielectric test on 132 kV GIS substation of Arak Aluminum Company
- Dielectric test on 132 kV GIS substation at line 7 of Tehran metro
- Partial discharge test on generator (Malard Karaj Power Repair Company) and generator (Khoy, Hamedan, Bandar Abbas, Shahid Rajai, Montazeri and Islamabad plants of Isfahan, Neyshabur, etc.)
- Performing more than hundreds of quality control tests on the equipment including switchgear, cable, switchgear, generator, insulator, arrester, reactor, etc., by the Laboratory of Jihad University of Science and Technology